SmartManufacturingSmart Manufacturing connects buyers with smart factory integrators, robotics workcells, MES/SCADA systems, IIoT platforms, vision inspection lines, and intralogistics automation solutions.
Container Apartment Multiple-Story Prefabricated Housing Modular House Integrated Dormitory
Mes Scada And Digital Manufacturing

Container Apartment Multiple-Story Prefabricated | RFQ Sourcing Details

Mes Scada And Digital Manufacturing · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryMES SCADA and Digital Manufacturing
Unitset
CategoryMES SCADA and Digital Manufacturing
CertificationISO Customized: Customized
MaterialSteel Structure Wind Resistance: Typhoon Earthquake Resistance: M6
UsageWarehouse, Villa, Dormitories, Temporary Offices, Workshop, Sch , Apartment, Ho
CategoryMes Scada And Digital Manufacturing
AvailabilityInquiry required
Updated2026-05-30

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Mes Scada And Digital Manufacturing. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

What is MiC? MiC(Modular Integrated Construction) is an innovative construction method. By using MiC, the building is substantially completed off-site. This can reduce on-site construction processes and enhance site safety, hence achieving higher productivity. 1.

Free-standing integrated modules (completed with finishes, fixtures and fittings) manufactured in a factory;2. Modules transported to construction site;3. Modules installed to form a building. Our Modular Integrated Construction system now can be built up to 40 stories .

It can be applied to build school, apartment, hospital, dormitory, office building, etc. We have 3 series of MIC with different structure system, and they can be customized according to client's demand. 1.

Steel MiC Each steel MiC module is formed of structural steel members as the main frame and RC slab as the floor system. The module frame and connections are designed to fulfill serviceability and ultimate limit states. 10-15 days production cycle per unit. 2.

Concrete MiC The annual design production capacity of volumetric concrete MiC and non-volumetric components is up to 180,000 square meters.There are 10 productions lines in this plant which include: • Double 120 mixing stations;• QSPSC certificated laboratory;•;• Automatic steel processing lines;• Sewage treatment and dust collectors;3.

ALUMINUM MiC Each module is formed of aluminum structural members as the main frame and also the interior decoration and exterior claddings are made of aluminum. • 10 days production cycle per unit;• ≤ 4-storey height

Container | Applications and Buyer Notes

Container is organized as a sourcing-ready Mes Scada And Digital Manufacturing reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements a

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
MES SCADA and Digital ManufacturingBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Certification
ISO Customized: CustomizedBased on visible page data; confirm exact value in the RFQ.
Material
Steel Structure Wind Resistance: Typhoon Earthquake Resistance: M6Based on visible page data; confirm exact value in the RFQ.
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Sch , Apartment, HoBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryMES SCADA and Digital Manufacturing
Unitset
CategoryMES SCADA and Digital Manufacturing
CertificationISO Customized: Customized
MaterialSteel Structure Wind Resistance: Typhoon Earthquake Resistance: M6
UsageWarehouse, Villa, Dormitories, Temporary Offices, Workshop, Sch , Apartment, Ho

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

Smart Manufacturing related sourcing paths

Related categories Smart Manufacturing related paths
Related applications Smart Manufacturing related paths
Related solutions Smart Manufacturing related paths

Smart Manufacturing related product samples

Supplier profile

Smart Manufacturing Imported Supplier Pool
主营:MES SCADA and Digital Manufacturing

View full profile >