SmartManufacturingSmart Manufacturing connects buyers with smart factory integrators, robotics workcells, MES/SCADA systems, IIoT platforms, vision inspection lines, and intralogistics automation solutions.
Building Material 4mm Thickness 1500mm Width Cut to Length and Leveling Machine Cut to Length Line
Intralogistics And Smart Warehousing

Building Material 4mm Thickness 1500mm Width Cut | RFQ Sourcing Details

Intralogistics And Smart Warehousing · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryIntralogistics and Smart Warehousing
Unitset
Type380v/3ph/50hz Main Motor
Powerrequirement
colorcoating 8
PrecisionAnd Faster Speed Technical Parameters 1
certification2. Custom Design Acceptable 3. Higher
CategoryIntralogistics And Smart Warehousing
AvailabilityInquiry required
Updated2026-05-27

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Intralogistics And Smart Warehousing. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Product Display 1. CE,ISO certification 2. Custom Design Acceptable 3. Higher Precision And Faster Speed Technical Parameters 1. Power requirement Type 380v/3ph/50hz Main Motor power 5.5kw Cutter power 4kw 2. Forming speed(m/min) 15 Not include the time of cutting 3.

Forming stations upper7buttom 8 Depend on actual design 4. Thickness of structure 16mm 5. Forming shaft diameter(mm) 90 6. Chains 1 inch 7. Sleeve galvanized pipe with color coating 8. Type of cutting Roll formed and length-set cutting 9. Control system PLC Panasonic 10.

Install dimension(depend on the final design) 2.2m×1.35m×1.2m Without panel length 11. Total weight (Approx) 4T Depend on final design 12. Screen Text screen /touch screen

Building | Applications and Buyer Notes

Building is organized as a sourcing-ready Intralogistics And Smart Warehousing reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements a

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Intralogistics and Smart WarehousingBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Type
380v/3ph/50hz Main MotorBased on visible page data; confirm exact value in the RFQ.
Power
requirementBased on visible page data; confirm exact value in the RFQ.
color
coating 8Based on visible page data; confirm exact value in the RFQ.
Precision
And Faster Speed Technical Parameters 1Based on visible page data; confirm exact value in the RFQ.
certification
2. Custom Design Acceptable 3. HigherBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryIntralogistics and Smart Warehousing
Unitset
Type380v/3ph/50hz Main Motor
Powerrequirement
colorcoating 8
PrecisionAnd Faster Speed Technical Parameters 1
certification2. Custom Design Acceptable 3. Higher

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

Smart Manufacturing related sourcing paths

Related categories Smart Manufacturing related paths
Related applications Smart Manufacturing related paths
Related solutions Smart Manufacturing related paths

Smart Manufacturing related product samples